The test will complete after a specified period elapsed, and the second condition is met.

  1. Set the Load generation time (hh:mm:ss) property.
  2. Set the secondary condition by configuring the After the completion condition is reached property by selecting one of the following

Here is an example: A test case consists of 10 requests, and a test runs with one VU for 60 seconds. Let's say, after 60 seconds, this VU completed five full iterations (which are 50 completed requests) and started iteration #6 by sending seven requests and receiving 4 of them back.

If the test has more VUs, then StresStimulus will wait until the last VU finishes the test.