Test Duration | Set the test completion criteria. After reaching this condition, the test will stop. See Also: Test Duration |
Test Duration Properties
Properties | Description |
---|---|
Test Completion Condition | Select the test completion condition from the drop-down. |
How to count iterations | Select Per VU to set the iteration limit for each VU. Select Total to set the overall iteration limit. |
Max. iterations | After the specified number of iterations is issued, the Test waits until all responses are received and stops. |
Load generation time (hh:mm:ss) | Enter the duration of load generation, after which no request will be issued. |
After the Completion Condition is reached | After the specified test completion condition is reached, depending on this selection, test will stop, will wait until all pending responses are received, or will wait for started iterations to complete. |
Warm-up time (s) | The warm-up period at the beginning of the test is necessary to prepare server for normal working conditions. During the warm-up period the number of VU is gradually ramped-up, server cache is populated, and necessary modules are loaded into the memory. During the warm-up period performance metrics are not collected. |