- Created by SS Doc Editor, last modified by SS Doc Editor on Sep 20, 2021
The delay object adds a pause in iteration execution. 1. Go to the Build Test Case node. 2. Select the object where you want to insert the delay. 3. Right-click and select Insert Object -> Insert Delay, then select Insert Before or Insert After. 4. In the property, the grid set the Delay (s) property to the number of seconds to delay. 5. Set the Include in transaction time property to Yes to include the delay time in the total parent transaction time. This option is typically used for emulating client execution times. Delay The Delay (s) property can include fractions of a second. For example, to set a delay to 100ms set the property to .1. | ![]() |
- No labels
Overview
Content Tools