- Created by SS Doc Editor on Sep 11, 2020
Help Boxes
Test Duration | Set the test completion criteria. After reaching this condition, the test will stop. See Also: Test Duration |
Test Duration Properties
Properties | Description |
---|---|
Test Completion Condition | Select the test completion condition from the drop-down. |
How to count iterations | Select Per VU to set the iteration limit for each VU. Select Total to set the overall iteration limit. |
Max. iterations | After the specified number of iterations is issued, the Test waits until all responses are received and stops. |
Load generation time (hh:mm:ss) | Enter the duration of load generation, after which no request will be issued. |
After the Completion Condition is reached | After the specified test completion condition is reached, depending on this selection, the test will stop, will wait until all pending responses are received, or will wait for started iterations to complete. |
Warm-up time (s) | The warm-up period at the beginning of the test is necessary to prepare the server for normal working conditions. During the warm-up period, the number of VU is gradually ramped-up, server cache is populated, and essential modules are loaded into the memory. During the warm-up period, performance metrics are not collected. |
Time limit to reach the goal | The maximum time allowed to reach the goal. The test will stop if the goal is not reached by then. |
Test duration after the goal is reached | The amount of time after reaching the goal, The test will continue with the same number of VUs. |