- Created by SS Doc Editor on Sep 09, 2021
Test progress elements are located on the toolbar and in the Test Progress Panel Toolbar Elements: 1. The Progress bar displays the test’s general progress status (a). A load test typically consists of 2 main phases:
The progress of each of the phases is displayed in two separate progress cycles from 0 to 100%. The name of phase (b) is displayed on the left of the progress bar as follows.
2. The Health Monitor (c) monitors the StresStimulus test machine and alerts when it is approaching its capacity limit. That helps to avoid test machine overload to sustain high test accuracy. The following color coding is used:
| |||||||||||||||||||||||||
Test Progress Panel: 3. Test progress panel displays the following parameters:
Tip: Requests Sent = Requests Pending + Responses OK + Errors + Timeouts |
Note: The test log is updated in batches with a 60-90 second delay.
Info: The full list of parameters in the test metric grids is provided in the User Interface Reference-> Runtime Dashboard.
- No labels