Search the Configuring Test section

 

StresStimulus generates test workload by executing several procedures:

These procedures are executed independently and concurrently. As a result, multiple VUs may be instantiated at different times, and each of them emulates the load by looping through their respective iterations independently until the test tends. If the test consists of several test cases, then different VUs will loop through different test cases.

 

All steps of configuring a test are performed on the Main tab on the third sections in the Workflow Tree, Configure Test.